This strategic pre-feasibility report, designated Project 002, details a plan for deploying twenty accessible outpatient hubs across Africa.

HealthNot yet documented1 published document
All project documents
Sector
Health and reproductive care · Primary care
Geographic scope
North Africa, West Africa, Central Africa, East Africa, Southern Africa
Status
Proposed project type
Documents
1 published

Project mission

The project addresses the high global and African regional prevalence of untreated vision, hearing and oral disease, aiming to provide essential care to local beneficiaries. It implements a district outpatient center model that integrates assessment, treatment, product support and repair to close the service loop. By contracting qualified, licensed operators and providing funded operations, the initiative intends to overcome access barriers and achieve lasting health outcomes for the community.

It upgrades the Revision A strategy of October 2026, maintaining its service design, hub prototype and service scope while incorporating new technical drawings and an upgraded financial model. The strategy focuses on eye, ear and oral health, using an integrated approach that includes outreach, referral and a sustainable supply chain. It provides an illustrative ten-year delivery programme and a gated board approval process, ensuring rigorous evidence-based implementation and rigorous financial and operational governance for each hub's activation.

Reviewed Nov 14, 2026.

Purpose

The need

From the source document

The project identifies a need for vision, hearing, and oral health care in sub-Saharan Africa. Documented needs include: 11,450 cases of unmet vision need per 100,000 residents, 3,361 cases of hearing loss that a device can help, and 38,776 cases of untreated caries or severe periodontal disease. Published global estimates indicate 2.2 billion people have vision impairment, 430 million need rehabilitation for hearing loss, and nearly 3.7 billion are affected by oral diseases.

Intended communities

From the source document

The intended communities are residents of catchments of 100,000 people, with a focus on districts in sub-Saharan Africa. The programme includes regional adaptation examples for example countries across five African regions, including North Africa, West Africa, Central Africa, East Africa, and Southern Africa.

Objectives

Proposed outcome, not a reported result

The objective is to establish twenty accessible, outpatient hubs to connect three professional services: eye, ear, and oral care. The programme aims to provide accessible assessment, qualified care, and useful products, ensuring follow-up and repair remain part of the service, with free covered essential care and funded operation.

Services and delivery

Services and components

From the source document

  • Two vision rooms with a 6.00-metre optical path each
  • A hearing assessment room with an accessible acoustic enclosure
  • A fitting and support zone
  • Two dental rooms with one chair each
  • Instrument processing area
  • Reception and family waiting area
  • Accessible facilities, staff area, and store
  • Outreach kits for vision, hearing, and oral screening

How the project works

From the source document

The project operates through a hub connected to three care pathways (vision, hearing, and dental). Each pathway follows four steps: 1) Accessible entry (booking), 2) Qualified assessment by a professional, 3) Care and fitting, and 4) Follow-up and repair. The hub serves as a central location on a host health campus, using outreach to connect communities to the hub and contracted partners for specialist referrals.

Infrastructure and technical requirements

From the source document

Hubs require a single-storey building of 559.36 square metres gross. Technical requirements include solar power (30 kilowatts peak, 60 kilowatt-hours battery storage), backup generator (25 kilovolt-amperes), water storage (two tanks of 5,000 litres), and dental-specific utilities like compressed air and suction. Site requirements include step-free arrival (1 in 20 ramps) and accessible washrooms.

Workforce and training

Proposed outcome, not a reported result

The establishment for one hub is twenty positions, including 13 clinical and 7 support roles, with 8 licensed practitioners. Role families include vision clinicians, hearing clinicians, dentists and dental assistants, instrument processing personnel, management, reception, outreach, and cleaning. Staff are funded and undergo supervision.

Logistics and supply chains

From the source document

The supply chain includes procurement of spectacles, hearing devices, and dental materials. Long-lead clinical equipment is ordered at authorisation. Reusable instruments are reprocessed on-site. Delivery follows a specified lot-based procurement schedule.

Operations and maintenance

Proposed outcome, not a reported result

  • Each hub operates with 20 funded positions, with a 600,000 allowance per full operating year for nine lines: personnel, dental/clinical consumables, spectacles/hearing devices/supports, utilities/communications, maintenance/calibration, outreach/transport, access/interpretation/training, administration/insurance, and an asset replacement reserve.
  • The operator, a qualified clinical provider, is paid for verified service based on completed care pathways, waiting time, and functional benefit.
  • Specialist surgery, general anaesthesia, sedation, and implanted hearing devices are excluded and referred.

Implementation

Implementation phases

Proposed outcome, not a reported result

  • The ten-year programme spans 2027–2036, with implementation in gated cohorts: hubs 1 and 2 open at month 24, hubs 3 to 6 at month 30, hubs 7 to 13 at month 51, and hubs 14 to 20 at month 63. Each cohort is authorised on the evidence of previous pilots.
  • Preparatory work for hubs 1 to 6 occurs in months 0 to 9, using a programme-level allocation.
  • Board decisions release capital at seven gates (Gates 0 to 6), with Gate 3 (design, cost and procurement approval) being a critical passage for every hub.

Budget and resources

Proposed outcome, not a reported result

  • Reference capital is 2.0 million United States dollars per hub, based on nine master plan accounts.
  • Annual operation allowance is 600,000 United States dollars per full operating year, with requirement modeled at 412,449 in operating year 1, 484,563 in operating year 6, and 499,312 in operating year 8.
  • The twenty-hub program inside 2027-2036 is modeled at 111.7 million United States dollars.

Risks and dependencies

From the source document

  • Five critical risks are identified: referral capacity and unfunded referrals; unlicensed service or unsuitable scope; invalid hearing or vision measurements; failed dental water or instrument processing; and inaccessible service, privacy or safeguarding failure.
  • Operational risks are managed through an interface register and interface checks at specific gates.
  • Safety-critical failures keep a service closed until re-certified.

Community and outcomes

Community participation

Proposed outcome, not a reported result

  • Community participation includes disability-led consultation for district needs, and the use of an accessible complaint route.
  • Communities and schools are engaged in the outreach assessment and booking process; the hub service connects to schools and health centres through an outreach coordinator and a named second adult.
  • Disability-organisation consultation is required for readiness criteria at the district level.

Environmental and social considerations

From the source document

  • Environmental considerations include water and electricity sizing derived from load schedules and water balance records.
  • The design uses solar arrays (30 kilowatts) and battery storage, and requires infection-prevention measures including clinical waste collection and safe disposal.
  • Acoustic enclosure in the hearing room is required to meet specified ambient noise limits.

Intended outcomes and measurement

Proposed outcome, not a reported result

  • Intended outcomes include completed care pathways, waiting times, and functional benefit after treatment.
  • Performance is measured via metrics including effective coverage, appointment and referral completion, and product-usefulness surveys.
  • Verified service is the basis for reporting and payment, with verification by an independent reviewer.

Connected projects

Documents

Main project strategyCurrent project strategyCurrent edition

Project 002

A strategic pre-feasibility report that outlines a programme for establishing outpatient hubs for vision, hearing, and dental care in Africa. It provides reference designs, costing models, and delivery programmes for these healthcare facilities.

Version
1.0
Published
Nov 14, 2026
Language
English
Size
8.9 MB
Pages
148

Sources

The document, version, and pages behind the statements on this page.

  • TitleOfficial title as printed on coverProject 002, version 1.0, pages 1
  • Project missionMission statement based on strategy componentsProject 002, version 1.0, pages 1
  • SummarySummary based on strategy content and scopeProject 002, version 1.0, pages 1, 2
  • Geographic scopeRegional adaptation details in Part 9Project 002, version 1.0, pages 88, 90-96
  • GeneralStatus of the documentProject 002, version 1.0, pages 1, 2
  • The needProject 002, version 1.0, pages 7, 8
  • Intended communitiesProject 002, version 1.0, pages 8, 9, 88-96
  • ObjectivesProject 002, version 1.0, pages 1, 5, 11
  • Services and componentsProject 002, version 1.0, pages 5, 11, 22
  • How the project worksProject 002, version 1.0, pages 10, 11, 35
  • Infrastructure and technical requirementsProject 002, version 1.0, pages 5, 11, 17, 18, 21, 22
  • Workforce and trainingProject 002, version 1.0, pages 15, 73
  • Logistics and supply chainsProject 002, version 1.0, pages 11, 16, 37, 69
  • Implementation phasesProject 002, version 1.0, pages 6, 38, 40, 66
  • Operations and maintenanceProject 002, version 1.0, pages 5, 11, 15, 17, 75, 76
  • Community participationProject 002, version 1.0, pages 9, 15, 74
  • Environmental and social considerationsProject 002, version 1.0, pages 17, 26, 30, 31, 32
  • Budget and resourcesProject 002, version 1.0, pages 1, 5, 6, 17, 46, 58
  • Risks and dependenciesProject 002, version 1.0, pages 84, 85, 86
  • Intended outcomes and measurementProject 002, version 1.0, pages 7, 10, 75, 76
  • Figure2.0 million United States dollars capital per reference hub.Project 002, version 1.0, pages 1, 5
  • Figure600,000 United States dollars per full operating year.Project 002, version 1.0, pages 1, 5
  • Figure111.7 million United States dollars for twenty hubs inside 2027–2036.Project 002, version 1.0, pages 1, 5
  • Figure15 months from the authorisation of a hub to its opening.Project 002, version 1.0, pages 1, 69
  • Figure2.0 million United States dollars capital per reference hub.Project 002, version 1.0, pages 1, 5
  • Figure600,000 United States dollars per full operating year allowance.Project 002, version 1.0, pages 1, 5
  • Figure111.7 million United States dollars for twenty hubs inside 2027–2036.Project 002, version 1.0, pages 1, 5
  • Figure15 months from the authorisation of a hub to its opening.Project 002, version 1.0, pages 1, 4

Questions and answers

Are the vision, hearing, and dental access hubs available now?

No. The document is a strategic pre-feasibility report that is not for construction, procurement, or clinical treatment.

How many appointments are planned for one hub annually?

The planning frame is 10,400 appointments a year, which includes vision, hearing, and dental services.

Is the service free for the user?

The model assumes that essential care is free at the point of use, and the service agreement prevents informal charges, though specialist services outside the hub may have different boundaries.

What happens if a hub or instrument fails?

Procedures pause until a test is passed or a validated cycle is recorded, as per the clinical governance of the operator.

How is the hub built?

The reference route is an existing building adapted to the design, with a new build requiring a separate board decision.