Project 088

Housing and settlements

In-situ settlement upgrading

This approach upgrades existing settlements by systematically improving infrastructure without relocating families.

HousingNot yet documented
Sector
Housing and settlements
Status
Proposed project type

Project mission

In-situ settlement upgrading is intended to serve residents living in underserved, unplanned areas by improving existing infrastructure and safety. This project aims to provide access to basic utilities, stabilized pathways, and improved public space within the existing community fabric. The benefit sought is to empower residents to remain in their homes while achieving a higher standard of living and security.

It focuses on installing reliable water, sanitation, and electricity connections along newly stabilized paths. Public spaces are improved to ensure better drainage and safety. The program works within the existing neighborhood layout to minimize disruption while maximizing benefits for every household. This collaborative process ensures that essential services reach every corner of the community in a way that respects the established social and physical environment.

Draft profile. Written from the project title to describe the intended model, and not yet reconciled with the project strategy document.

Purpose

The need

Many households reside in settlements that lack formal connections to basic municipal services, leading to health and safety challenges. Upgrading addresses these gaps by installing necessary infrastructure within the current footprint. This approach provides immediate improvement to daily living conditions, increasing stability and resilience for families who would otherwise face the risks associated with displacement or environmental hazards.

Intended communities

Upgrading is for all residents, with a strong focus on accessibility. Improvements include paving walkways to be firm and level for wheelchairs or strollers, and ensuring lighting extends to every entrance. Inclusion is maintained by involving all community members in the planning of their shared spaces.

Objectives

  • To provide formal, reliable access to clean water and sanitation in every home.
  • To stabilize community pathways to ensure safe, all-weather navigation for residents.
  • To integrate necessary drainage systems that reduce the risk of flooding.
  • To enhance public security through well-lit, accessible communal spaces.

Services and delivery

Services and components

  • Networked water lines and localized sanitation collection points.
  • Stabilized and illuminated walking paths for pedestrian safety.
  • Surface drainage channels to prevent accumulation of stagnant water.
  • Secure, standardized utility connection points for every household.
  • Small-scale, multi-use community squares for social gatherings.

How the project works

The process begins with a collaborative mapping of the settlement to identify critical gaps in infrastructure. Construction crews install primary utility lines and pave walkways while working around existing structures. Once installed, these services are connected to individual homes. Operations and maintenance are managed by a local community committee, supported by technicians who ensure the system continues to function effectively through regular check-ups and service updates.

Infrastructure and technical requirements

Infrastructure consists of durable utility pipes, paved walkways, and surface-water drainage systems. Electrical connectivity is improved through new, safe distribution lines that reach every dwelling. The project places high priority on safety by installing durable lighting and clearing paths to allow for easy emergency access throughout the entire settlement.

Workforce and training

Work is carried out by local teams recruited from within the community and surrounding areas. Roles include general construction laborers, utility technicians, and path builders. Training focuses on the installation and maintenance of standardized service lines, creating long-term employment opportunities and ensuring the community has local expertise to manage its new facilities.

Logistics and supply chains

Procurement centers on modular equipment and bulk materials that are suitable for narrow, dense environments. Storage of materials is handled at small, localized depots to minimize site footprint. The logistics strategy prioritizes timely delivery of essential components, reducing wait times and ensuring that infrastructure installation proceeds with minimal daily disturbance.

Operations and maintenance

Operations involve the ongoing management of utility connections and regular cleaning of drainage channels. A local committee oversees shared infrastructure, while residents are provided with simple maintenance training for their individual connections. This ensures that the system remains functional and responsive to community needs over the long term.

Implementation

Risks and dependencies

  • Limited space for infrastructure installation: Utilize micro-trenching techniques and modular utility components to fit into existing narrow layouts.
  • Disruption during construction: Implement phased construction plans that allow for continuous pedestrian movement and service access.
  • Maintenance neglect: Establish a community-based maintenance council with dedicated, transparent funding and training for local technicians.

Community and outcomes

Community participation

Consultation is essential, with planning sessions held in the community to ensure proposed upgrades reflect resident priorities. Feedback loops are established to address specific concerns during the construction phase, fostering a sense of shared ownership and ensuring the final improvements serve everyone equitably.

Environmental and social considerations

The project enhances the local environment by managing runoff and reducing pollution from inadequate sanitation. Upgrades include planting native vegetation along walkways to stabilize soil and improve thermal conditions. Construction practices prioritize minimal ground impact to preserve the natural character of the existing settlement landscape.

Intended outcomes and measurement

  • Number of households newly connected to formal water and electricity services.
  • Percentage of community pathways upgraded to firm, all-weather, and well-lit standards.
  • Reductions in the occurrence of flood-related incidents within the settlement area.
  • Level of resident participation in the planning and management of upgrading activities.

Connected projects

Documents

The strategy for project 088 has not been published yet.

It will appear here, with any supporting documents, as soon as it is released. Open the document library

Questions and answers

Will my home be moved during the upgrade process?

The goal of in-situ upgrading is to improve the settlement as it currently exists. Construction is specifically designed to work around existing homes and paths to ensure that families can remain in their homes throughout the entire upgrading process.

How does this improve safety in our neighborhood?

Safety is improved by providing firm, well-lit pathways that are easier to walk on, even at night or in the rain. Additionally, new drainage systems help reduce the risk of flooding and standing water, creating a cleaner and safer environment for all.

What happens if a utility connection stops working?

A community committee is established to manage the upkeep of these new services. If a connection requires attention, residents report the issue to the local technicians, who are trained to perform quick repairs using standard parts to restore service immediately.

Can I participate in deciding where the improvements happen?

Community consultation is a central part of this project. Everyone is encouraged to participate in planning meetings to share their views on where the most important needs are and how the upgrades can best serve the daily movement and life of the neighborhood.

Take part in this project

Community organizations, technical specialists, implementation partners, and prospective funding partners can open a conversation about project 088.

Discuss project 088